top of page

ELECTRICAL

MOK Constructions has completed in excess of 450 individual projects over the past 3 years with projects varying in size and complexity from construction of warehousing facilities to transformer enclosures within a Zone Substation.
Melbourne Airport Zone Substation (Jemena)
February 2014 - Present

 

Civil works included:

  • Resurfacing of the existing Terminal Station with appropriate material.

  • Supply and install High Voltage conduit system.

  • Civil works.

Yarraville Terminal Station (Jemena)
January 2013 - Present

 

Civil works included:

  • Preparation, treatment and site stabilisation.

  • Construct Control Room for High Voltage housing.

  • Construct Footing systems:

    • CT/VT structures

    • Control Room

    • Transformer enclosure

  • Supply and install Humeceptor system

Glenrowan Terminal Station (SPAusNet)
January 2013 - Present
 

Civil works included:

  • Construct and install footing systems:

    • CT/VT structures

    • Transformer enclosure systems

    • High Voltage Bus systems

  • Site treatment methods:

    • Excavation/shoring

Pascoe Vale Zone Substation (Jemena)
February 2011 - March 2012

 

Civil works included:

  • Preparation, treatment and site stabilisation.

  • Construct Control Room for High Voltage housing.

  • Construct Footing systems:

    • CT/VT structures

    • Control Room

    • Transformer bund enclosure

  • Construction and installation of Transformer enclosure with hebel wall

bottom of page